a. Inform Chief Engineer.
b. Note down the V/L Position from the bridge.
c. Take the sounding of the bilge tank.
d. Check the 15ppm alarm for its proper working.
e. Open the overboard valve , open sea water valve & bilge pump inlet and outlet valve.
f. Note down the time of starting.
g. Start the bilge pump & fill the OWS with sea water. Let the OWS run on sea water for 10-15 mins.
h. Slowly close the sea water inlet valve & start opening the outlet valve of the bilge tank.
No comments:
Post a Comment